Certified Installer Program

Installer Application Questionnaire

This application is how we evaluate installers for the MacroAir Certified Installer Program. Answer every question as specifically as you can — installations, licenses, safety programs, and reference details are independently verified.

10 sections 36 questions ~15 min to complete Questions: jpennington@macroairfans.com
Before you start: Have your license numbers, insurance carrier and coverage amounts, most recent TRIR (Total Recordable Incident Rate) and EMR (Experience Modification Rate) figures, and three professional references on hand. Fields marked * are required to submit. A few questions carry extra weight in our review — those are flagged Key criterion.

This person receives all program communications, including lead notifications.

Describe your background specifically with high-volume, low-speed fans — brands installed, approximate volume, facility types, and years of experience. General ceiling fan or HVAC experience alone won't answer this — be specific.

Required in every state where your crews perform electrical work; MacroAir verifies independently.

Preferred; required for projects involving BAS/BMS integration.

Currently in good standing?

Any past suspension/revocation?

Installers access secured industrial facilities as part of this program.

MacroAir's minimum is $2,000,000 in general liability coverage.

Required, no exceptions.

EMR of 1.0 or lower is required for Certified status; above 1.25 needs an explanation.

MacroAir fans ship with VFDs factory pre-programmed — no on-site VFD configuration is required. General familiarity is preferred.

All MacroAir fans mount via beam clamp to structural steel — this is a required capability.

Be specific and operational — this tells us more about judgment and safety awareness than any other question. Generic answers won't stand out.

Written safety program on file

Regular toolbox talks

Written LOTO procedures

Training documented for all field staff

HVLS installs typically require lift work at 20–60 ft.

Written fall protection program

Lift operators currently certified

Be specific and sequential. Strong answers cover: pre-inspection, structural verification, lockout/tagout, wiring, torque verification, blade clearance check, low-speed spin test, escalation path, and documentation.

Be specific — list states or regions. This determines lead routing, so accuracy matters more than breadth.

Commercial or industrial HVLS projects are preferred. MacroAir contacts all three references directly.

Reference 1

Reference 2

Reference 3

Tier determines lead routing, rep assignment, and co-marketing investment.

e.g. warehouse/distribution, manufacturing, agriculture, aviation, cold storage, sports & recreation. Used to match you with the right leads.

MacroAir requires all quote responses returned within 48 hours of receipt. Installers who do not respond within this window will be removed from active lead distribution. I acknowledge and commit to this requirement.*

I confirm all information provided in this application is accurate. I consent to MacroAir's verification of all licenses, insurance, EMR (Experience Modification Rate), TRIR (Total Recordable Incident Rate), and references. I agree to complete factory training before performing any certified installation, and to annual re-certification.*